University of Kansas New Chiller Plant

ÌýThe University of Kansas new chiller plant project included mechanical and electrical installation for a new plant to serve up to nine buildings on campus, designed with both current and future use in mind.

The MEP project included the following scopes. Electrical: 15kV Medium Voltage Installation, including: 15kV switch, 15kV transformer, 15kV conductors, 15kV termination; 480v/277v 3 phase 4 wire; 3,000 amp (Main Service Entrance); Mechanical: (2) 1,000-ton chillers (with room for four total); (2) cooling towers; 11 pumps; Pre-insulated HDPE pipe 4-inch to 18-inch (different sizes for chilled/hot water)

P1 single-source capabilities included: Virtual Design & Construction (BIM); Building Technologies; Controls; Mechanical Construction; Electrical Construction; Pipe, Plumbing, and Sheet Metal Fabrication

Project Details

Location

Lawrence, KS

Completion

2025

construction services icon
Work with Our Construction and Fabrication Experts

Need a team of professional specialty contractors to help with your next construction project? Get started by finding a P1 Construction location near you.

project portfolio icon
View More Construction Projects

Still not sure if Âé¶¹´å is the right fit? Feel free to check out more examples of our past work and hear from our statisfied customers.